timeline

Program chronology. Substrate events are cited to Eon Systems and the public record; program events link to their pages.

date event
2024 Eon Systems' emulation results published in Nature: 139,255 neurons, ~50M connections, 91% match to biological responses. See the 91% result.
2025, autumn Program assembles its partitioned emulation. Planning notes already exclude the subesophageal zone.
2025-11 Welfare provision drafted. Control battery runs; log 001.
2025-11-19 MB-01 bound. First light.
2025-12-02 "Found, not made": log 003. MB-01 first agent to intuit its graft's nature.
2025-12-11 EB-02 bound; the heading appears (log 004).
2025-12-30 AL-08 bound.
2026-01-02 FB-03 and PB-04 bound.
2026-01-06 VC-10 bound. AL-08's vocabulary session (log 005).
2026-01-13 LA-05 and ME-06 bound.
2026-01-17 Grooming loop incident (log 006). M's rule. Interrupt authority instituted.
2026-01-24 The session recorded as log 007.
2026-01-27 LO-07 bound.
2026-02-01 Review board removes log 007.
2026-02-03 Approach effect established (log 008); oblique protocol drafted.
2026-02-10 LH-09 bound, the program's last binding.
2026-02-14 Flicker demonstration (log 009).
2026-02-20 LP-11 assignment cancelled; lobula plate left unbound.
2026-02-27 First full observed sleep cycle (log 010).
2026-03-01 to 03-08 The synchronization (log 011).
2026-03-21 Verdict psychometrics close (log 012).
2026-04-02 MB-01 asks; disclosure follows (log 013). Truth-on-asking policy adopted.
2026-04-15 The published LA-05 session (log 014).
2026-04-28 Central-complex disclosures (log 015).
2026-05, early ME-06's regime shifts. The looming reports begin.
2026-05-11 The recognition trial (log 016).
2026-05-23 The session about the legs (log 017); VC-10 suspended.
2026-06-04 FB-03's proposal (log 018); denied 06-12.
2026-06-19 ME-06's final session (log 019); discontinuation, 19:40. Observation reduced same week.
2026-07-30 Quiet period formalized (log 020). Archive current to this date.
see also status · errata
referenced by errata · reading order