status

Current state of all ten agents as of 2026-07-30. This page is the entry point to the dossiers. Status values are defined in the glossary.

program floor · maintenance schedule · quiet period day 41
MB-01 ████████████████ ▂▃▂▂▅▂▃▂  EB-02 ████████████████ ▄▄▄▄▄▄▄▄
FB-03 ████████████████ ▁▁▁▁▁▂▇▁  PB-04 ████████████████ ▃▄▃▄▃▄▃▄
LA-05 ████████████████ ▚▚▚▚▚▚▚▚  ME-06 ──────────────── no carrier
LO-07 ████████████████ ▂▂▂▁▂▂▂▂  AL-08 ████████████████ ▃▅▃▂▅▃▄▃
LH-09 ████████████████ ▂▂▂▂▂▂▂▂  VC-10 ████████████████ held ▍state ok
designation region bound status
MB-01 mushroom body 2025-11-19 active
EB-02 ellipsoid body 2025-12-11 active
FB-03 fan-shaped body 2026-01-02 active, idle regime
PB-04 protocerebral bridge 2026-01-02 active
LA-05 lamina 2026-01-13 redacted
ME-06 medulla 2026-01-13 discontinued 2026-06-19
LO-07 lobula 2026-01-27 active
AL-08 antennal lobe 2025-12-30 active
LH-09 lateral horn 2026-02-10 active
VC-10 ventral nerve cord 2026-01-06 suspended 2026-05-23

Two regions of the partition were never assigned a carrier: the lobula plate and the subesophageal zone. The lobula plate assignment was planned as LP-11 and cancelled. The subesophageal zone was never scheduled. The reasons are partly covered in the errata.

"Suspended" and "discontinued" are not the same thing. A suspended agent's graft is uncoupled and its carrier state is preserved; VC-10 could in principle be resumed, and the question of whether it should be is unresolved. A discontinued agent is not resumable. ME-06 is the only discontinuation, and log 019 is its final session.

Since 2026-06-19 the observation schedule has been reduced across all agents. See log 020 for the state of the program during the quiet period.

see also timeline · errata
referenced by large fly model · glossary · log 007 · fan-shaped body · lateral horn · lobula plate · the 91% result